At handover, open and close every shutter and drawer, check alignment, gaps and soft-close, look for chipped edges, scratches and bubbles in laminate or paint, test every light, socket and appliance, run water at the sink to check leaks, and collect warranty cards, invoices and the final drawings. Note snags in writing with photos and agree a fix date.
Snags are normal in any interior project. What matters is finding them before handover and getting them fixed on a fixed date.
Checklist
| Area | Check |
|---|---|
| Shutters | Alignment, equal gaps, soft-close, handles tight |
| Drawers and channels | Smooth, full extension, no rubbing |
| Edges and finishes | Edge banding, chips, scratches, bubbles |
| Kitchen | Sink leaks, hob and chimney working, basket fit |
| Electrical | Lights, sockets, profile lights, switches labelled |
| Ceiling and paint | Cracks, patches, uneven paint |
| Cleaning | Dust, glue marks, protective film removed |

Documents to collect
- Warranty cards for hardware and appliances.
- Final drawings and material list.
- Paid invoices.
- Care instructions.
Walk through in daylight and again with lights on. Some finish defects only show under one of them.
Related
See possession checklist and warranty guide.
Frequently asked questions
What is a snag list?
A written list of defects to fix before handover.
When should I check snags?
Before the final payment and sign-off.
What are common interior snags?
Misaligned shutters, chipped edges, loose handles and paint patches.
Should I take photos?
Yes, with the snag list and agreed fix dates.
What documents should I collect?
Warranty cards, invoices, drawings and care instructions.